PS 200 Climbing Bracket System

PS 200 climbing bracket is a reliable and safe system for forming concrete on elevated structures. It can be formed quickly and safely at any height. The shutter fitted to the climbing bracket has three axis of movement and moves along with the climbing bracket reducing the overall cycle time. Along with the PS 200 climbing bracket a hanging access platform is provided for safe working when repairing tie holes, carrying out finishing work and removing anchors used on previous pours.

Category:

PS 200 CLIMBING BRACKET SYSTEM

FEATURES OVERVIEW

• With the climbing bracket, the formwork is mounted on a carriage with roller bearings and can be moved by approx. 60 cm

• Climbing bracket can be used for concreting height of 3.60 m

• Standard finishing platform is provided with the climbing bracket

• Tension belt CB as wind bracing

• Width of bracket: 2.00 m – height: 1.80 m – retraction length: 60 cm – max. formwork height: 3.6 m

• 100 % crane operated economical system

• Beams options: H20 Timber or Aluminium Beams can be used efficiently.

• Painted finish can be offered

• Offers maximum multiple reuse sustainability

• Offers standard health and safety protection components to workers

• All system components are manufactured in SCAFFCO premises.

ADVANTAGES 

• Climbing bracket is normally used for supporting large-sized, anchored wall formwork.

• Optimal System when external climbing is required

• Climbing Bracket has compatibility with various formwork systems

• System Works Independently without additional reinforcement due to anchor availability

• The climbing unit consists of formwork, working platform, brackets with formwork carriage and strong backs as well as finishing platform designed to resist normal formwork loads in addition to wind load.

• Climbing forms can be designed to operate in high winds

• Complete wind-shield protection on platform edges is also possible.

• Speedy onsite and time-saving moving procedure of the securely assembled large scaffold units consisting of platform and formwork in only one crane lift.

• A small but skilled workforce is required on site to handle operations

• Guard rails and Edge protection is normally fixed after or during the assembly of the system units for meeting safety regulations as per international standards.