FRAME SHORING SYSTEM
FEATURES OVERVIEW
• Frame Shoring Systems most outstanding feature is its high load bearing capacity of upto 60 KN per leg
• The frame is made of robust steel in various heights of 1.80m, 1.50m, 1.20m, 1.0 m and 0.75m all suitable for various heavy shoring uses.
• Large frame width, for optimum stability
• Variable inter-frame spacing
• Offers maximum site use flexibility
• Small number of system components
• Crane time saving erection method
• Frames are painted, electroplated or hot dip galvanized steel as per customer request.
• The top U-head and base jack allow a precision and a fast handling of the structure.
• Primary decking options: Aluminium Beam T150, Aluminium Beam T225, Steel Soldier, Steel Waling W12 or W10
• Secondary decking Options : H20 Timber Beam, Aluminium Beam T150, Aluminium Beam S150, LVL Beam
• High number of reuse cycles
• Normally, plywood by contractor, but can be provided by SCAFFCO on request
• Offers standard health and safety protection components to workers
• All system components are manufactured in SCAFFCO premises.
ADVANTAGES
• Frame shoring towers are the ideal shoring solution for high thick slabs and bridges.
• Used by a vast number of construction professionals, frame shoring system provides support for both independent towers and fixed scaffolding depending on application requirements.
• Frame Shoring System is a completely tool less system with bolt free connections, the shoring frames are joined with spigot connector and the frames are secured against lift-off by using pigtail pins.
• The Shoring Frames with low number of components saves time and money in assembly and dismantling due to reduced number of loose parts, versus traditionally assembled scaffold systems containing standards, ledgers and diagonal braces
• The Welded Frames with no loose parts are light weight with a logical assembly sequence, so erecting and dismantling the towers is easy and safe even for relatively unskilled labour. This helps in lowering the labour cost for the construction site.
• Frame shoring system offers un-matchable time saving when compared with assembly of traditional scaffolding made of separate standards and ledgers (approximately 30% faster)
• By using the pigtail pins, the shoring tower can be assembled horizontally on the ground and can then be placed by a crane into position, providing contactors with savings from the minimal use of crane time.
• The Frame Shoring System is compatible with a variety of formwork girders such as H20 timber beams, Aluminum Beams and LVL beams.
• Frame Shoring System offers sustainability for site use with a reuse life time over many construction cycles with minimal waste.